{"id":1745,"date":"2026-08-21T01:21:59","date_gmt":"2026-08-21T01:21:59","guid":{"rendered":"https:\/\/soctfiber.com\/?p=1745"},"modified":"2026-08-21T01:22:03","modified_gmt":"2026-08-21T01:22:03","slug":"24-core-hybrid-fiber-power-cable-rru-malaysia","status":"publish","type":"post","link":"https:\/\/soctfiber.com\/pt\/24-core-hybrid-fiber-power-cable-rru-malaysia\/","title":{"rendered":"Cabo h\u00edbrido de fibra \u00f3ptica e energia de 24 n\u00facleos para 31 locais com RRU na Mal\u00e1sia"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/soctfiber.com\/wp-content\/uploads\/2026\/08\/soctfiber-hybrid-fiber-power-cable-rru-installation-1024x576.webp\" alt=\"\" class=\"wp-image-1746\" style=\"width:724px;height:auto\" srcset=\"https:\/\/soctfiber.com\/wp-content\/uploads\/2026\/08\/soctfiber-hybrid-fiber-power-cable-rru-installation-1024x576.webp 1024w, https:\/\/soctfiber.com\/wp-content\/uploads\/2026\/08\/soctfiber-hybrid-fiber-power-cable-rru-installation-300x169.webp 300w, https:\/\/soctfiber.com\/wp-content\/uploads\/2026\/08\/soctfiber-hybrid-fiber-power-cable-rru-installation-768x432.webp 768w, https:\/\/soctfiber.com\/wp-content\/uploads\/2026\/08\/soctfiber-hybrid-fiber-power-cable-rru-installation-1536x864.webp 1536w, https:\/\/soctfiber.com\/wp-content\/uploads\/2026\/08\/soctfiber-hybrid-fiber-power-cable-rru-installation.webp 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Em maio de 2026, uma empreiteira de infraestrutura de telecomunica\u00e7\u00f5es preparou uma atualiza\u00e7\u00e3o para LTE\/5G abrangendo <strong>31 locais de RRU ao ar livre na Mal\u00e1sia<\/strong>. O projeto de instala\u00e7\u00e3o original previa o uso de cabos separados de fibra \u00f3ptica e de alimenta\u00e7\u00e3o CC entre a \u00e1rea inferior de equipamentos e cada unidade de r\u00e1dio remota.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Essa abordagem era tecnicamente vi\u00e1vel, mas v\u00e1rios locais j\u00e1 existentes tinham espa\u00e7o limitado nas bandejas dos telhados e nas escadas de cabos das torres. Adicionar mais duas faixas de cabos paralelas aumentaria o trabalho de roteamento, fixa\u00e7\u00e3o e manuten\u00e7\u00e3o.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ap\u00f3s analisar os tra\u00e7ados do local, a SOCTFiber prop\u00f4s um <strong>Cabo h\u00edbrido de fibra \u00f3ptica e energia com 24 n\u00facleos<\/strong> combinando condutores de transmiss\u00e3o \u00f3ptica e de energia CC em uma \u00fanica estrutura de cabo para uso externo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A decis\u00e3o final abrangeu <strong>3,72 km de cabo<\/strong>, embalados em seis tambores de madeira para distribui\u00e7\u00e3o pelos 31 locais.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Requisitos do projeto<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Item do projeto<\/th><th>Especifica\u00e7\u00e3o Final<\/th><\/tr><\/thead><tbody><tr><td>Projeto<\/td><td>Atualiza\u00e7\u00e3o do local da RRU LTE\/5G<\/td><\/tr><tr><td>Localiza\u00e7\u00e3o<\/td><td>Mal\u00e1sia<\/td><\/tr><tr><td>Tipo de cliente<\/td><td>Empresa contratada para obras de infraestrutura de telecomunica\u00e7\u00f5es<\/td><\/tr><tr><td>N\u00famero de locais<\/td><td>31<\/td><\/tr><tr><td>Produto<\/td><td>Cabo h\u00edbrido de fibra e energia de 24 n\u00facleos<\/td><\/tr><tr><td>Comprimento total do cabo<\/td><td>3,72 km<\/td><\/tr><tr><td>Rotas individuais<\/td><td>Aprox. 78\u2013146 m<\/td><\/tr><tr><td>Fibra \u00f3ptica<\/td><td>24 n\u00facleos G.652D<\/td><\/tr><tr><td>Condutores de energia<\/td><td>2 \u00d7 10 mm\u00b2 de cobre<\/td><\/tr><tr><td>Elemento central de refor\u00e7o<\/td><td>FRP<\/td><\/tr><tr><td>Prote\u00e7\u00e3o<\/td><td>Blindagem de fita de a\u00e7o<\/td><\/tr><tr><td>Jaqueta externa<\/td><td>Educa\u00e7\u00e3o F\u00edsica ao ar livre<\/td><\/tr><tr><td>Embalagem<\/td><td>6 tambores de madeira de 620 m<\/td><\/tr><tr><td>Prazo de produ\u00e7\u00e3o<\/td><td>18 dias<\/td><\/tr><tr><td>Entrega<\/td><td>CIF Porto de Klang<\/td><\/tr><tr><td>Aplica\u00e7\u00e3o<\/td><td>Transmiss\u00e3o por fibra \u00f3ptica + alimenta\u00e7\u00e3o CC para RRUs externas<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">O cabo foi desenvolvido com base na tecnologia da SOCTFiber <a href=\"https:\/\/soctfiber.com\/category\/products\/fiber-optic-cable\/hybrid-fiber-optic-cable\/\"><strong>cabo h\u00edbrido de fibra \u00f3ptica<\/strong><\/a> plataforma que integra fibras \u00f3pticas e condutores el\u00e9tricos em um \u00fanico cabo para aplica\u00e7\u00f5es nas \u00e1reas de telecomunica\u00e7\u00f5es e infraestrutura.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">O principal problema do projeto: dois trechos de cabos em um trajeto j\u00e1 sobrecarregado<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A maioria dos 31 locais consistia em instala\u00e7\u00f5es j\u00e1 existentes, e n\u00e3o em torres rec\u00e9m-constru\u00eddas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Portanto, a empreiteira teve que contornar as escadas para cabos, as bandejas, os condutores de aterramento e os cabos de comunica\u00e7\u00e3o que j\u00e1 estavam instalados.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">O plano inicial previa:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>um cabo \u00f3ptico + um cabo de alimenta\u00e7\u00e3o CC para cada rota de RRU.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Isso significava que dois cabos distintos precisavam ser instalados, fixados, identificados e mantidos ao longo de um trajeto praticamente id\u00eantico.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A abordagem h\u00edbrida alterou isso para:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>um cabo externo combinado que cont\u00e9m tanto as fibras \u00f3pticas quanto os condutores de energia de cobre.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Nesse projeto, o benef\u00edcio residiu principalmente na efici\u00eancia da instala\u00e7\u00e3o, e n\u00e3o no desempenho \u00f3ptico.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Plano original<\/th><th>Solu\u00e7\u00e3o definitiva para cabos h\u00edbridos<\/th><\/tr><\/thead><tbody><tr><td>Cabo de fibra \u00f3ptica separado<\/td><td>Fibras \u00f3pticas integradas em cabo h\u00edbrido<\/td><\/tr><tr><td>Cabo de alimenta\u00e7\u00e3o CC separado<\/td><td>Condutores de cobre integrados no mesmo cabo<\/td><\/tr><tr><td>Dois tra\u00e7ados de cabos paralelos<\/td><td>Um trajeto comum para os cabos<\/td><\/tr><tr><td>Dois tipos de cabos para gerenciar<\/td><td>Uma constru\u00e7\u00e3o de cabo principal<\/td><\/tr><tr><td>Solicita\u00e7\u00e3o inicial de condutor de 2 \u00d7 6 mm\u00b2<\/td><td>Revisado para 2 \u00d7 10 mm\u00b2<\/td><\/tr><tr><td>Mais pontos de fixa\u00e7\u00e3o e de roteamento<\/td><td>Redu\u00e7\u00e3o do gerenciamento de cabos em trajet\u00f3ria comum<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">O projeto h\u00edbrido n\u00e3o eliminou a termina\u00e7\u00e3o \u00f3ptica ou el\u00e9trica. Essas fun\u00e7\u00f5es continuavam separadas na extremidade do equipamento.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">O que isso reduziu foi a quantidade de cabeamento f\u00edsico necess\u00e1rio entre a \u00e1rea de equipamentos inferior e a RRU.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Por que os condutores de cobre passaram de 6 mm\u00b2 para 10 mm\u00b2<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Essa foi a decis\u00e3o de engenharia mais importante antes do in\u00edcio da produ\u00e7\u00e3o.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A solicita\u00e7\u00e3o de cota\u00e7\u00e3o inicial da empreiteira especificava:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Fibra G.652D de 24 n\u00facleos + 2 condutores de cobre de 6 mm\u00b2.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Se o cabo tivesse sido cotado apenas com base no n\u00famero de fibras e no di\u00e2metro dos condutores, a produ\u00e7\u00e3o poderia ter come\u00e7ado com essa configura\u00e7\u00e3o.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Em vez disso, a SOCTFiber solicitou as informa\u00e7\u00f5es reais sobre a rota.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A inspe\u00e7\u00e3o no local revelou trechos de cabos que variam de aproximadamente <strong>78 m a 146 m<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Isso mudou o rumo da discuss\u00e3o.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">No caso de um cabo h\u00edbrido RRU, o tamanho do condutor n\u00e3o pode ser selecionado independentemente de:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Tens\u00e3o de opera\u00e7\u00e3o CC;<\/li>\n\n\n\n<li>corrente ou pot\u00eancia do equipamento;<\/li>\n\n\n\n<li>comprimento do cabo em um sentido;<\/li>\n\n\n\n<li>resist\u00eancia do condutor;<\/li>\n\n\n\n<li>queda de tens\u00e3o aceit\u00e1vel;<\/li>\n\n\n\n<li>carga futura de equipamentos.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">As rotas mais longas eram a principal preocupa\u00e7\u00e3o.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Depois que a empreiteira analisou os requisitos el\u00e9tricos em rela\u00e7\u00e3o \u00e0s dist\u00e2ncias medidas dos cabos, o projeto original <strong>2 \u00d7 6 mm\u00b2<\/strong> a especifica\u00e7\u00e3o foi alterada para <strong>2 condutores de cobre de 10 mm\u00b2<\/strong> antes da produ\u00e7\u00e3o.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">O aumento da se\u00e7\u00e3o transversal do condutor reduziu a resist\u00eancia ao longo dos percursos mais longos de alimenta\u00e7\u00e3o de corrente cont\u00ednua e proporcionou maior margem de seguran\u00e7a para o projeto.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Isso evitou um dos erros mais caros na aquisi\u00e7\u00e3o de cabos h\u00edbridos: descobrir, ap\u00f3s a instala\u00e7\u00e3o, que o link \u00f3ptico funciona corretamente, mas que o condutor de energia tem capacidade insuficiente para o trajeto.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para projetos semelhantes de RRU, o condutor deve, portanto, ser determinado com base na carga el\u00e9trica e na dist\u00e2ncia real do cabo, em vez de ser copiado das especifica\u00e7\u00f5es de outro local.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A SOCTFiber aborda esses fatores de sele\u00e7\u00e3o em seu <a href=\"https:\/\/soctfiber.com\/hybrid-fiber-power-cable-for-outdoor-rru-sites\/\"><strong>Artigo sobre as especifica\u00e7\u00f5es do cabo h\u00edbrido de fibra \u00f3ptica e alimenta\u00e7\u00e3o para locais de RRU ao ar livre<\/strong><\/a>.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/soctfiber.com\/wp-content\/uploads\/2026\/08\/soctfiber-hybrid-fiber-power-cable-drum-1024x576.webp\" alt=\"\" class=\"wp-image-1747\" style=\"width:720px;height:auto\" srcset=\"https:\/\/soctfiber.com\/wp-content\/uploads\/2026\/08\/soctfiber-hybrid-fiber-power-cable-drum-1024x576.webp 1024w, https:\/\/soctfiber.com\/wp-content\/uploads\/2026\/08\/soctfiber-hybrid-fiber-power-cable-drum-300x169.webp 300w, https:\/\/soctfiber.com\/wp-content\/uploads\/2026\/08\/soctfiber-hybrid-fiber-power-cable-drum-768x432.webp 768w, https:\/\/soctfiber.com\/wp-content\/uploads\/2026\/08\/soctfiber-hybrid-fiber-power-cable-drum-1536x864.webp 1536w, https:\/\/soctfiber.com\/wp-content\/uploads\/2026\/08\/soctfiber-hybrid-fiber-power-cable-drum.webp 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\">Por que foram utilizadas 24 fibras \u00f3pticas<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">O projeto n\u00e3o exigiu que todas as 24 fibras entrassem em opera\u00e7\u00e3o no primeiro dia.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A empreiteira incluiu deliberadamente uma margem de capacidade.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Foram reservadas fibras adicionais para:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>futura expans\u00e3o da rede;<\/li>\n\n\n\n<li>caminhos de transmiss\u00e3o redundantes;<\/li>\n\n\n\n<li>equipamentos adicionais;<\/li>\n\n\n\n<li>manuten\u00e7\u00e3o;<\/li>\n\n\n\n<li>substitui\u00e7\u00e3o caso uma fibra espec\u00edfica ficasse indispon\u00edvel.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">No caso de uma torre j\u00e1 existente, em que o acesso e o tra\u00e7ado dos cabos j\u00e1 s\u00e3o dif\u00edceis, deixar fibras sobressalentes dentro do cabo instalado pode ser mais pr\u00e1tico do que adicionar outro cabo \u00f3ptico posteriormente.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A fibra monomodo G.652D foi escolhida para a parte de transmiss\u00e3o do cabo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">O SOCTFiber dispon\u00edvel <a href=\"https:\/\/soctfiber.com\/24-cores-hybrid-fiber-power-cable-for-rru-architecture-in-mobile-networks\/\"><strong>Cabo h\u00edbrido de fibra \u00f3ptica e alimenta\u00e7\u00e3o de 24 n\u00facleos para arquitetura RRU<\/strong><\/a> tamb\u00e9m permite que a configura\u00e7\u00e3o \u00f3ptica e el\u00e9trica seja adaptada de acordo com os requisitos do projeto.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Estrutura final do cabo<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Ap\u00f3s a confirma\u00e7\u00e3o dos requisitos \u00f3pticos e el\u00e9tricos, a constru\u00e7\u00e3o final do cabo foi definida da seguinte forma:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Fibra \u00f3ptica G.652D de 24 n\u00facleos<\/strong><\/li>\n\n\n\n<li><strong>2 condutores de cobre de 10 mm\u00b2<\/strong><\/li>\n\n\n\n<li><strong>Elemento central de refor\u00e7o em FRP<\/strong><\/li>\n\n\n\n<li><strong>prote\u00e7\u00e3o blindada com fita de a\u00e7o<\/strong><\/li>\n\n\n\n<li><strong>revestimento externo de PE para uso ao ar livre<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Os locais inclu\u00edam plataformas em telhados, trechos de escadas verticais e percursos expostos em torres.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Como algumas se\u00e7\u00f5es poderiam sofrer contato mec\u00e2nico durante a instala\u00e7\u00e3o ou em manuten\u00e7\u00e3o posterior, a empreiteira optou por manter a estrutura blindada com fita de a\u00e7o, em vez de utilizar a op\u00e7\u00e3o n\u00e3o blindada, mais leve, discutida inicialmente.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">O revestimento externo de PE foi escolhido para uso ao ar livre.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A estrutura do cabo foi, portanto, escolhida com base no tra\u00e7ado real, em vez de simplesmente se especificar a constru\u00e7\u00e3o mais resistente dispon\u00edvel.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">O comprimento do cabo foi calculado com base na medi\u00e7\u00e3o do trajeto, e n\u00e3o na altura da torre<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Surgiu outro problema durante a prepara\u00e7\u00e3o do pedido.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">O cronograma preliminar de instala\u00e7\u00e3o dos cabos inclu\u00eda as alturas das torres, mas a altura das torres n\u00e3o corresponde ao comprimento dos cabos instalados.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">O trajeto efetivo tamb\u00e9m incluiu:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>o trajeto do cabo a partir dos equipamentos inferiores;<\/li>\n\n\n\n<li>se\u00e7\u00f5es horizontais do telhado;<\/li>\n\n\n\n<li>mudan\u00e7as de dire\u00e7\u00e3o;<\/li>\n\n\n\n<li>roteamento em torre vertical;<\/li>\n\n\n\n<li>Cargo inicial na RRU;<\/li>\n\n\n\n<li>indeniza\u00e7\u00e3o por rescis\u00e3o;<\/li>\n\n\n\n<li>reserva de instala\u00e7\u00e3o.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Depois que a empreiteira atualizou as medi\u00e7\u00f5es do trajeto, os comprimentos individuais dos trechos de cabo variaram entre aproximadamente <strong>78 m a 146 m<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Essas informa\u00e7\u00f5es foram utilizadas para determinar a quantidade a ser produzida.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A decis\u00e3o final foi a seguinte: <strong>3,72 km<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Esse planejamento adicional reduziu o risco de chegar ao local com um cabo que fosse apenas alguns metros mais curto \u2014 um pequeno erro de medi\u00e7\u00e3o que pode tornar inutiliz\u00e1vel um cabo inteiro j\u00e1 cortado.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Produ\u00e7\u00e3o e Testes<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A produ\u00e7\u00e3o foi conclu\u00edda em <strong>18 dias ap\u00f3s a aprova\u00e7\u00e3o final das especifica\u00e7\u00f5es<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Como o cabo h\u00edbrido de fibra \u00f3ptica e energia el\u00e9trica cont\u00e9m elementos \u00f3pticos e el\u00e9tricos, o plano de inspe\u00e7\u00e3o abrangeu o cabo inteiro, e n\u00e3o apenas as fibras \u00f3pticas.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Verifica\u00e7\u00f5es \u00f3pticas<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>tipo e n\u00famero de fibras;<\/li>\n\n\n\n<li>identifica\u00e7\u00e3o de fibras;<\/li>\n\n\n\n<li>continuidade \u00f3ptica;<\/li>\n\n\n\n<li>atenua\u00e7\u00e3o nos comprimentos de onda de teste acordados.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Verifica\u00e7\u00f5es el\u00e9tricas<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>especifica\u00e7\u00e3o do condutor;<\/li>\n\n\n\n<li>continuidade;<\/li>\n\n\n\n<li>resist\u00eancia el\u00e9trica;<\/li>\n\n\n\n<li>identifica\u00e7\u00e3o do condutor.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Essa etapa foi particularmente importante porque a se\u00e7\u00e3o do condutor havia sido alterada, passando dos 6 mm\u00b2 solicitados originalmente para 10 mm\u00b2 antes do in\u00edcio da produ\u00e7\u00e3o.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Verifica\u00e7\u00f5es da constru\u00e7\u00e3o do cabo<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Elemento de refor\u00e7o em FRP;<\/li>\n\n\n\n<li>constru\u00e7\u00e3o de blindagem;<\/li>\n\n\n\n<li>Revestimento de PE;<\/li>\n\n\n\n<li>di\u00e2metro do cabo;<\/li>\n\n\n\n<li>condi\u00e7\u00e3o da superf\u00edcie;<\/li>\n\n\n\n<li>marca\u00e7\u00e3o de cabos;<\/li>\n\n\n\n<li>dura\u00e7\u00e3o da produ\u00e7\u00e3o.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">O objetivo era confirmar se o cabo entregue estava de acordo com as especifica\u00e7\u00f5es finais do projeto, e n\u00e3o com a solicita\u00e7\u00e3o de cota\u00e7\u00e3o original do cliente.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Percorrendo 3,72 km por 31 locais diferentes<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Fornecer toda a quantidade em um \u00fanico tambor grande teria sido inconveniente para a implanta\u00e7\u00e3o em campo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A empreiteira planejou a instala\u00e7\u00e3o em v\u00e1rios grupos de locais, por isso o cabo foi embalado em:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>6 tambores de madeira \u00d7 620 m<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">em vez disso.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Isso facilitou o trabalho das equipes de instala\u00e7\u00e3o na movimenta\u00e7\u00e3o dos cabos entre os locais e na distribui\u00e7\u00e3o dos comprimentos restantes dentro de cada grupo de locais.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cada tambor foi identificado antes do envio com as especifica\u00e7\u00f5es relevantes do cabo e as informa\u00e7\u00f5es sobre o comprimento.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Portanto, a remessa final continha:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>6 tambores de madeira;<\/li>\n\n\n\n<li>620 m por tambor;<\/li>\n\n\n\n<li>3,72 km de comprimento total do cabo.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">O pedido foi preparado para envio para <strong>Port Klang, Mal\u00e1sia<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Instala\u00e7\u00e3o: um trajeto de cabo, duas fun\u00e7\u00f5es<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Durante as primeiras instala\u00e7\u00f5es no local, a equipe percebeu imediatamente uma diferen\u00e7a pr\u00e1tica entre o cabo h\u00edbrido e um cabo \u00f3ptico pequeno comum.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Os condutores de cobre e a estrutura blindada tornaram o cabo h\u00edbrido mais pesado e menos flex\u00edvel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">O m\u00e9todo de instala\u00e7\u00e3o foi adaptado de acordo com isso.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A equipe controlou:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>dire\u00e7\u00e3o de tra\u00e7\u00e3o;<\/li>\n\n\n\n<li>raio m\u00ednimo de curvatura;<\/li>\n\n\n\n<li>intervalos de fixa\u00e7\u00e3o;<\/li>\n\n\n\n<li>peso do cabo na vertical;<\/li>\n\n\n\n<li>trajeto contornando a estrutura de a\u00e7o da torre;<\/li>\n\n\n\n<li>posi\u00e7\u00e3o de ruptura pr\u00f3xima \u00e0 RRU.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">O cabo foi fixado gradualmente ao longo do trajeto vertical, em vez de ser esticado em toda a sua extens\u00e3o primeiro e preso depois.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Isso ajudou a evitar tens\u00f5es mec\u00e2nicas desnecess\u00e1rias na se\u00e7\u00e3o \u00f3ptica.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">A fibra e a alimenta\u00e7\u00e3o foram separadas na RRU<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Embora as duas fun\u00e7\u00f5es compartilhassem o mesmo cabo principal, a fibra \u00f3ptica e a alimenta\u00e7\u00e3o de corrente cont\u00ednua continuavam sendo sistemas separados.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">No ponto de termina\u00e7\u00e3o previsto, o cabo foi aberto e dividido em:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>se\u00e7\u00e3o \u00f3ptica \u2192 termina\u00e7\u00e3o\/conex\u00e3o de fibra<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">e<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>condutores de cobre \u2192 conex\u00e3o de alimenta\u00e7\u00e3o CC<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Foi reservado um comprimento adequado de extens\u00e3o para que ambos os elementos pudessem alcan\u00e7ar seus pontos de conex\u00e3o sem for\u00e7ar o cabo a fazer uma curva acentuada.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Isso foi confirmado durante o planejamento da instala\u00e7\u00e3o, em vez de ser deixado para a equipe de campo resolver no local.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para a RRU e outras arquiteturas de redes m\u00f3veis, o SOCTFiber tamb\u00e9m oferece um <a href=\"https:\/\/soctfiber.com\/ring-network-deployment-for-base-station-solution\/\"><strong>solu\u00e7\u00e3o de rede de fibra \u00f3ptica para esta\u00e7\u00f5es base<\/strong><\/a> abrangendo a conectividade \u00f3ptica em torno da infraestrutura de esta\u00e7\u00f5es base de telecomunica\u00e7\u00f5es.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Verifica\u00e7\u00e3o do local ap\u00f3s a instala\u00e7\u00e3o<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">As conex\u00f5es \u00f3pticas foram verificadas novamente ap\u00f3s a instala\u00e7\u00e3o dos cabos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A equipe de campo utilizou testes de continuidade \u00f3ptica e OTDR para verificar os trajetos das fibras instaladas antes do comissionamento da rede.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Os circuitos de corrente cont\u00ednua foram verificados separadamente antes de o equipamento RRU ser ligado.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As verifica\u00e7\u00f5es realizadas no local n\u00e3o revelaram nenhum problema de perda \u00f3ptica anormal associado \u00e0 instala\u00e7\u00e3o do cabo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Os percursos mais longos tamb\u00e9m se beneficiaram da revis\u00e3o da condutividade realizada antes da produ\u00e7\u00e3o. A empreiteira n\u00e3o precisou substituir o cabo h\u00edbrido instalado nem adicionar um cabo de corrente cont\u00ednua separado de maior capacidade, gra\u00e7as \u00e0 proposta original de 6 mm\u00b2.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pode-se dizer que essa an\u00e1lise de engenharia na fase de pr\u00e9-produ\u00e7\u00e3o foi mais importante para o projeto do que a pr\u00f3pria fabrica\u00e7\u00e3o do cabo.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Resultado do projeto<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A atualiza\u00e7\u00e3o dos 31 locais foi conclu\u00edda utilizando:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>31 trajetos de cabos da RRU<\/strong><\/li>\n\n\n\n<li><strong>3,72 km de cabo h\u00edbrido de fibra \u00f3ptica e energia el\u00e9trica<\/strong><\/li>\n\n\n\n<li><strong>Fibra \u00f3ptica G.652D de 24 n\u00facleos<\/strong><\/li>\n\n\n\n<li><strong>2 condutores de cobre de 10 mm\u00b2<\/strong><\/li>\n\n\n\n<li><strong>6 tambores de madeira de 620 m<\/strong><\/li>\n\n\n\n<li><strong>FRP + blindagem com fita de a\u00e7o + constru\u00e7\u00e3o externa em PE<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">O principal resultado foi um trajeto de cabos mais simples.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Em vez de instalar um cabo \u00f3ptico dedicado ao lado de um cabo de alimenta\u00e7\u00e3o CC dedicado, a empreiteira utilizou um cabo h\u00edbrido para o trajeto comum e separou as duas fun\u00e7\u00f5es apenas pr\u00f3ximo aos equipamentos.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Antes x Instala\u00e7\u00e3o final<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Antes<\/th><th>Final<\/th><\/tr><\/thead><tbody><tr><td>Dois cabos no trajeto comum da RRU<\/td><td>Um cabo h\u00edbrido<\/td><\/tr><tr><td>Roteamento independente de fibra e energia<\/td><td>Trajeto combinado do cabo principal<\/td><\/tr><tr><td>6 mm\u00b2 propostos inicialmente<\/td><td>10 mm\u00b2 ap\u00f3s a revis\u00e3o do tra\u00e7ado<\/td><\/tr><tr><td>Mais ocupa\u00e7\u00e3o da escada\/bandeja<\/td><td>Espa\u00e7o reduzido na rota comum<\/td><\/tr><tr><td>Dois tipos principais de cabos<\/td><td>Um cabo espec\u00edfico para o projeto<\/td><\/tr><tr><td>Maior carga de trabalho relacionada ao gerenciamento de cabos em campo<\/td><td>Identifica\u00e7\u00e3o mais simples das rotas<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">O projeto tamb\u00e9m demonstrou por que um cabo h\u00edbrido n\u00e3o deve ser encomendado apenas pelo nome do produto.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A diferen\u00e7a entre um cabo adequado e um inadequado estava nos detalhes: <strong>comprimento do trajeto, tamanho do condutor, capacidade \u00f3ptica, estrutura de prote\u00e7\u00e3o e m\u00e9todo de termina\u00e7\u00e3o<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">O que os compradores devem verificar antes de encomendar um cabo h\u00edbrido RRU<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Para projetos semelhantes, uma solicita\u00e7\u00e3o de or\u00e7amento deve incluir mais do que:<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Por favor, envie uma cota\u00e7\u00e3o para um cabo h\u00edbrido de fibra \u00f3ptica de 24 n\u00facleos.<\/p>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">As informa\u00e7\u00f5es mais \u00fateis s\u00e3o:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>n\u00famero de fibras \u00f3pticas;<\/li>\n\n\n\n<li>tipo de fibra;<\/li>\n\n\n\n<li>RRU ou requisito de pot\u00eancia do equipamento;<\/li>\n\n\n\n<li>Tens\u00e3o de opera\u00e7\u00e3o CC;<\/li>\n\n\n\n<li>trajeto de cabo mais longo;<\/li>\n\n\n\n<li>m\u00e9todo de instala\u00e7\u00e3o;<\/li>\n\n\n\n<li>requisito de condutor, caso j\u00e1 tenha sido calculado;<\/li>\n\n\n\n<li>requisito de prote\u00e7\u00e3o mec\u00e2nica;<\/li>\n\n\n\n<li>quantidade total;<\/li>\n\n\n\n<li>n\u00famero de locais;<\/li>\n\n\n\n<li>local de entrega.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Caso o di\u00e2metro do condutor ainda n\u00e3o tenha sido confirmado, forne\u00e7a, em vez disso, a carga el\u00e9trica e a dist\u00e2ncia do cabo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Isso fornece ao fabricante do cabo informa\u00e7\u00f5es suficientes para analisar o projeto el\u00e9trico e mec\u00e2nico antes da produ\u00e7\u00e3o.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">\u00c9 poss\u00edvel transmitir fibra \u00f3ptica e alimenta\u00e7\u00e3o CC pelo mesmo cabo em uma RRU?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Sim. Um cabo h\u00edbrido de fibra \u00f3ptica e energia el\u00e9trica re\u00fane fibras \u00f3pticas e condutores de cobre para energia el\u00e9trica em uma \u00fanica estrutura de cabo. As fun\u00e7\u00f5es de fibra \u00f3ptica e energia el\u00e9trica compartilham o trajeto principal do cabo, mas s\u00e3o separadas nos pontos de termina\u00e7\u00e3o.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Como \u00e9 selecionada a se\u00e7\u00e3o do condutor de cobre para um cabo h\u00edbrido de fibra \u00f3ptica e energia el\u00e9trica?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">O tamanho do condutor deve ser verificado levando em conta a tens\u00e3o, a corrente ou a demanda de pot\u00eancia do equipamento, a dist\u00e2ncia do cabo e a queda de tens\u00e3o admiss\u00edvel. Trajetos mais longos ou cargas mais elevadas podem exigir uma se\u00e7\u00e3o transversal maior do condutor. O n\u00famero de fibras, por si s\u00f3, n\u00e3o \u00e9 suficiente para determinar o tamanho do condutor.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Um cabo h\u00edbrido RRU para uso externo precisa sempre de blindagem com fita de a\u00e7o?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">N\u00e3o. A blindagem deve ser adequada ao ambiente de instala\u00e7\u00e3o. Trajetos em torres expostas ou locais com maior risco mec\u00e2nico podem se beneficiar de prote\u00e7\u00e3o adicional, enquanto trajetos em bandejas ou condu\u00edtes protegidos podem utilizar um tipo diferente de constru\u00e7\u00e3o de cabo.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Quais informa\u00e7\u00f5es s\u00e3o necess\u00e1rias para um or\u00e7amento personalizado de um cabo h\u00edbrido de fibra \u00f3ptica e energia el\u00e9trica?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Informe o n\u00famero e o tipo de fibras, a tens\u00e3o do equipamento e os requisitos de pot\u00eancia, o comprimento do trajeto, o ambiente de instala\u00e7\u00e3o, a quantidade necess\u00e1ria e o destino. Caso o tamanho do condutor j\u00e1 tenha sido calculado, inclua essa especifica\u00e7\u00e3o tamb\u00e9m.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Suporte a Pedidos e Projetos<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A SOCTFiber fornece <strong>cabos h\u00edbridos de fibra \u00f3ptica e alimenta\u00e7\u00e3o para RRU, esta\u00e7\u00f5es base m\u00f3veis e projetos de infraestrutura de telecomunica\u00e7\u00f5es em ambientes externos<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As configura\u00e7\u00f5es dos cabos podem ser analisadas de acordo com a capacidade da fibra, a carga el\u00e9trica, o comprimento do trajeto, o tamanho do condutor, o ambiente de instala\u00e7\u00e3o e os requisitos de prote\u00e7\u00e3o mec\u00e2nica.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para solicitar um or\u00e7amento do projeto, envie:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>especifica\u00e7\u00e3o da fibra + dados de pot\u00eancia do equipamento + rota mais longa + m\u00e9todo de instala\u00e7\u00e3o + quantidade + destino<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">para que a estrutura do cabo possa ser confirmada antes da produ\u00e7\u00e3o.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>In May 2026, a telecom infrastructure contractor prepared an LTE\/5G upgrade covering 31 outdoor RRU sites in Malaysia. The original installation plan used separate optical fiber and DC power cables between the lower equipment area and each remote radio unit. That approach was technically workable, but several existing sites had limited space on rooftop trays [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1746,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10],"tags":[],"class_list":["post-1745","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/soctfiber.com\/pt\/wp-json\/wp\/v2\/posts\/1745","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/soctfiber.com\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/soctfiber.com\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/soctfiber.com\/pt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/soctfiber.com\/pt\/wp-json\/wp\/v2\/comments?post=1745"}],"version-history":[{"count":1,"href":"https:\/\/soctfiber.com\/pt\/wp-json\/wp\/v2\/posts\/1745\/revisions"}],"predecessor-version":[{"id":1748,"href":"https:\/\/soctfiber.com\/pt\/wp-json\/wp\/v2\/posts\/1745\/revisions\/1748"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/soctfiber.com\/pt\/wp-json\/wp\/v2\/media\/1746"}],"wp:attachment":[{"href":"https:\/\/soctfiber.com\/pt\/wp-json\/wp\/v2\/media?parent=1745"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/soctfiber.com\/pt\/wp-json\/wp\/v2\/categories?post=1745"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/soctfiber.com\/pt\/wp-json\/wp\/v2\/tags?post=1745"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}